Metal Stamping Line Machine Condition Audit
Metal Stamping Line Machine Condition Audit
Full-line condition audits for Uncoiler → Straightener → Feeder → Power Press — data-driven inspections to prevent breakdowns, improve quality and extend equipment life across Malaysia.
What the Condition Audit Is
Our Machine Condition Audit is a structured, on-site evaluation of your entire metal stamping line that measures actual operational behaviour and identifies hidden failure points. Instead of waiting for a breakdown to reveal weaknesses, this audit surfaces early signs of wear, misalignment and control issues so you can act proactively.
Why it matters
Early detection reduces unplanned downtime, protects dies and tooling, ensures consistent part quality, and supports smarter CAPEX decisions. A single, well-timed audit can save weeks of lost production and large repair costs.
Audit Scope & Inspection Points
| Area | Inspection Points | Benefit |
|---|---|---|
| Uncoiler & Coil Line | Coil tension & straightness, decoiler feed consistency, motor & bearing condition. | Reduce coil deformation and feeding interruptions; smoother upstream feed. |
| Straightener / Leveler | Roller alignment, crown adjustment, strip flatness checks and feed-through inspection. | Better strip profile, fewer take-up issues, consistent stamping entry conditions. |
| Feeder (NC / Servo) | Feed pitch accuracy, encoder & sensor health, clamp pressure, synchronization with press. | Improves part accuracy and prevents die damage from misfeeds. |
| Power Press Mechanical | Slide parallelism, bolster flatness, crank/web wear, bearing play, stroke consistency. | Ensures correct forming geometry and reduces uneven tonnage wear on dies. |
| Tonnage & Force Distribution | Actual tonnage measurement across slide positions; verify load distribution and press calibration. | Prevents under/over-pressing, protects dies and avoids quality variation. |
| Controls & Safety | PLC/drive diagnostics, encoder signals, E-stops, light curtains, interlocks and emergency stop checks. | Improves machine safety and reduces false trips or control-related downtime. |
| Lubrication & Maintenance | Lubrication status, oil condition, grease points, maintenance records verification. | Supports preventive planning and extends component life. |
| Vibration & Structural Check | Vibration spots, foundation integrity, fastener torque and machine anchoring. | Detects early structural issues and prevents progressive failures. |
Audit Process — Step by Step
- Pre-Audit Briefing: Understand production profile, recent failures and audit goals.
- On-Site Measurement: Level checks, slide parallelism, tonnage mapping across stroke positions, feed accuracy tests.
- Electrical & Control Checks: Read faults, inspect encoder signals, check PLC logs and safety circuit integrity.
- Operational Load Tests: Run progressive test parts to capture real-world behaviour and detect intermittent faults.
- Data Collation & Analysis: Compile measured values, vibration readings, and alignment data for diagnosis.
- Report & Action Plan: Deliver a prioritized audit report with corrective actions, estimated costs and maintenance schedule.
Frequently Asked Questions — Condition Audit
How long does a full-line condition audit take?
Do you measure actual tonnage?
Will we receive a formal audit report?
Can audits help reduce scrap and warranty rejects?
Are older machines suitable for auditing?
Do you provide follow-up implementation support?
Can you audit multiple lines across the factory?
Related Services
Consultancy & Advisory
On-Site Repair & Service
Installation, Relocation & Clearance
Priority audits & multi-line discounts available — enquire for a quote.
GL Engineering Support Sdn. Bhd. — Professional condition audits for Malaysia’s metal stamping industry. Data-driven. Practical. Actionable.